Air Conditioning Systems | Briggs & Forrester

Overview of Air Conditioning Systems

We specialise in the maintenance and end to end delivery, including design and installation of air conditioning systems from small offices units, computer rooms and call centres, through to specialist leisure centre units.

Briggs and Forrester Group's division Combined Energy Solutions are Refcom approved and the technicians are trained to the highest current standards and have a wealth of knowledge to ensure your systems work to the highest efficiency at all times.

Air conditioning units require regular scheduled maintenance visits to prevent any unnecessary breakdowns and downtime for your business. Our technicians are fully qualified in fault finding on all types of systems from split units, cassette units, VRV systems to specialist chiller systems.

Government Legislation has been introduced to meet the requirements of the European Energy Performance of Buildings Directive (EPBD). Air Conditioning systems have been targeted by government legislation for their high-energy usage. Those systems with an output greater than 12kW require an inspection to gain compliance and must be lodged with Landmark. We work in conjunction with the Briggs and Forrester Group division Low Energy Consultancy to provide the necessary air conditioning report, using their accredited inspectors.

Air Conditioning Systems

3 Merchant Square, London
Residential
3 Merchant Square
London

3 Merchant Square is a 21-storey residential building providing flexible living and retail space.

375 Kensington High Street
Residential
375 Kensington High Street
London

A luxury residential development in the heart of Kensington.

Aston Martin, Warwickshire
Industrial, Distribution and Automotive
Aston Martin
Warwickshire

The facility comprises a two-storey office block, customer reception area & adjoining 35,000 sqm production building.

Blackdale student accommodation UEA
Student Accommodation
Blackdale Student Accommodation
University of East Anglia, Norwich

Mechanical, electrical and public health services installation to 514 student bedrooms at the University of East Anglia.

Bvlgari Hotel, London
Hotels
Bvlgari Hotel
Knightsbridge, London

Mechanical, electrical and plumbing installations to a 87 bedroom luxury hotel.

Cable House, New Broad Street, London
Refurbishment & Fit-out
Cable House
New Broad Street, London

Refurbishment and CAT A fit–out of Cable House to provide 7 floors of modern air-conditioned, open plan office accommodation. 

Exterior, Crewe Lifestyle Centre, Crewe
Sports & Leisure
Crewe Lifestyle Centre
Crewe

Briggs and Forrester were appointed to provide a full building services solution under the North West Construction Hub framework.

Ebury Square, Belgravia, London
Residential
Ebury Square
London

A development of apartments in Belgravia, one of London's most prestigous areas.

Girlguiding UK, London
Commercial
Girl Guiding HQ
Buckingham Palace Road, London

A negotiated project involved the separation and conversion of the front and rear of this impressive & historic building.

HS2 office Birmingham
Refurbishment & Fit-out
HS2 office
Birmingham

The design, supply, installation, testing and commissioning of the Mechanical, Electrical, Public Health and Fire Fighting Services to

Exterior, Liverpool Exhibition Centre
Hotels
Liverpool Exhibition Centre & Hotel
Liverpool

Exhibition Centre and 4 star hotel adjacent to the existing Convention Centre and Arena.

Milton Keynes University Hospital
Healthcare
Milton Keynes University Hospital
Phase 2 ED Assessment Area (P21+)

M & E & Public Health installation for conversion of the original hospital entrance to create an A&E department.