30 Aug 2024
Briggs & Forrester Engineering Services Secure M&E Package of Works to Riverside 2 Energy from Waste Project
Briggs & Forrester Engineering Services are excited to be working on another project for Hitachi Zosen Inova (HZI), who are acting as the lead EPC contractor to Cory Group, the project’s owners.
Benchmarked as one of the largest and most efficient EfW facilities in the UK, Riverside 2 will be a new energy from waste facility located in Belvedere in the London Borough of Bexley, on the banks of the River Thames.
Once built, it will become key in providing London, and the Southeast of England with additional waste processing infrastructure and divert non-recyclable waste from landfill. The facility will process around 650,000 tonnes of waste per year, which will be used as fuel to generate enough electricity to power the equivalent of 176,000 homes every year.
Briggs & Forrester Engineering Services MEPH scope of works for this HZI project includes three separate packages consisting of the administration building, security & IT/comms and small power & lighting. These works are scheduled to commence early in 2025 with a 41-week programme.