01 Sep 2026

Briggs & Forrester Northern Region completes MEP works to Whitehall Riverside

Briggs & Forrester Northern Region are pleased to announce the successful completion and Gateway 3 approval of the full MEPH works at Whitehall Riverside, a landmark £140 million build-to-rent development in the heart of Leeds. The scheme marks the second completed project in partnership with Bowmer + Kirkland, reinforcing a strong and collaborative working relationship across major residential developments.

The project is one of the first to gain Gateway 3 approval as part of the Building Safety Act, a major milestone for the development reflecting the coordinated efforts and full compliance between all companies involved throughout the build.

Delivered on behalf of joint venture partners Legal & General and Glenbrook, Whitehall Riverside is now the largest completed build-to-rent scheme the city has seen since the completion of our Monk Bridge project, comprising two 18-storey residential towers which together deliver 500 apartments in a high-quality, amenity-rich living environment.

Briggs & Forrester Living were responsible for the full MEP installation, delivered in line with the design intent provided by MEP consultants Crooke Walker Consulting. A defining feature of the completed scheme is its fully electric heating strategy, supporting long-term energy efficiency, reduced carbon emissions and future-proofed building services, while the 10 duplex apartments are served by air source heat pump water cylinders, providing an efficient and low‑carbon method for space heating and hot water.

The MEP systems have been designed and installed to deliver high levels of comfort for residents while supporting the building’s sustainability credentials and operational performance, with the development designed to achieve BREEAM Excellent and HQM Level 4 (Home Quality Mark), reflecting high standards in environmental performance, energy efficiency and residential quality.

Through enhanced thermal design, a low‑carbon heating approach and the increased use of renewable electricity, the development is predicted to produce approximately 20% less carbon dioxide emissions than Building Regulations requirements.

The completed scheme also incorporates a range of wider sustainability and placemaking features. These include approximately 600m² of rain gardens to support sustainable drainage and surface water management, biodiverse landscaped spaces designed by re-form, and electric vehicle chargers supporting the city’s clean transport ambitions.

A soft landings approach has been embedded into the handover process, with residents provided with guidance and support on the operation of heating and hot water systems to help ensure that the intended energy efficiencies are realised in everyday use.

With Bowmer + Kirkland acting as Principal Contractor, the successful completion of Whitehall Riverside represents a significant milestone for all parties involved. The project builds on the teams’ previous successful delivery of The Goods Yard and is further complemented by the appointment on a third Leeds‑based scheme at Kirkstall Road, where Briggs & Forrester’s Northern Region are currently on site. Together, the projects demonstrate Briggs & Forrester’s proven capability to deliver large‑scale, sustainability‑led residential developments.