24 Sep 2026
Briggs & Forrester secures building services installation for Iconic Colmore Gate Tower refurbishment
Briggs & Forrester Engineering Services is pleased to announce its appointment to deliver the full building services installation for the major refurbishment of Colmore Gate Tower in Birmingham. The contract is awarded by McLaren Construction Group on behalf of AP Colmore (AP UK).

Located between the prestigious Colmore Row and the Snow Hill Business District, Colmore Gate Tower is a prominent landmark positioned opposite Snow Hill Station and a short walk from the forthcoming HS2 station at Birmingham Curzon Street. The building is being transformed to deliver over 171,000 sq ft of modern Grade A workspace at the heart of Birmingham’s commercial centre.
The 15 storey redevelopment will provide 14 floors of premium office accommodation, supported by a 9‑floor podium section, creating an advanced working environment tailored to the needs of future occupiers. The scheme places sustainability, wellbeing, and operational efficiency at its core.
Delivering High‑Performance, Low‑Carbon Engineering
As part of the building’s comprehensive refurbishment, Briggs & Forrester will provide a new HVRF system and install a new air source heat pump system to deliver comfort cooling, heating, and ventilation. The upgraded building services will also incorporate:
- High‑efficiency LED lighting and smart controls
- State‑of‑the‑art building, energy and power management systems
- Low‑carbon operation aligned with green construction principles
The project is underpinned by a core carbon philosophy, retaining the existing structure and foundations to significantly reduce embodied carbon while enabling the creation of contemporary, future‑proofed office space.
Colmore Gate Tower is targeting some of the highest global sustainability benchmarks, including:
- EPC A
- NABERS 5*
- BREEAM Excellent
- WELL Ready, with tenant route to Platinum
- Wired Score Platinum
M&E consultant Watkins Payne is conducting a whole life carbon and circular economy assessment, ensuring maximum reuse of existing materials and identifying further opportunities to reduce carbon impact. The project will meet or exceed the UK Net Zero Carbon Building Standards.
Upon completion, Colmore Gate Tower will deliver a high‑quality, sustainable, and energy‑efficient office destination that enhances tenant wellbeing through advanced building systems, improved environmental performance, and thoughtfully designed green spaces.
Project Team
McLaren Construction | Watkins Payne | Third London Wall | Buckley Gray Yeoman | Davies Maguire | AtkinsRealis