Mechanical, electrical & public health services to a new build 52000m2 Body In White (BIW) production facility.
Included integrated office and staff amenity areas.
All services located above an 8m ‘exclusion zone’ for subsequent client production machinery installation. Services include three Medium Voltage Substations, 2500A and 1250A power bus bars, sprinkler fire protection, drainage and sanitaryware, fluorescent lighting and bus bar, high velocity warm air heating, compressed air, process cooling and building management system. Building to be constructed at the active JLR Castle Bromwich production facility with service interfaces to the existing site infrastructure and associated logistical challenges.