Mechanical, Electrical and Public Health Services installation to phased works in two existing buildings.
Works were carried out to a two storey Maths classroom extension and a single storey Engineering extension including associated external works, external services and drainage.
Mechanical services included foul drainage, hot & cold water, natural gas, gas/oil fired boilers, LTHWH, local cooling units and general ventilation.
Electrical services included PV, LV distribution, general lighting/LV power, street/area/flood lighting, disabled facilities, CCTV, access control, security detection & alarm, lightning protection and structured cabling systems.