Falmouth
The new facility is an extension to the existing SERSF building on campus completed 3 years ago. The facility will provide additional 2No Labs, CTR rooms, offices and seminar rooms for the university to increase the research capabilities and give office accommodation to the increased number of lecturers and professors.
Briggs & Forrester are responsible for install all required building services as well as interlinking the services with the site wide systems while maintaining the integrity of the installations to SERSF 1 during the construction period.
Services includes Gas, Domestic Services, Deionised Water, Lab gases – CO2 & compressed air, Ventilation, Fume extract, Cooling – chilled water, DX cooling, Controls, Above ground drainage (incl lab drainage), Generator Installation, Mains Distribution, General power, CCTV, Lighting, Access control, Fire alarm, Intruder Alarm, Lightning protection, PV installation, Data, Refuge alarm and Mechanical wiring.