125 Deansgate

Manchester

175,000 sqft commercial scheme BREEAM ‘Excellent’ building

Engineering Services

125 Deansgate

Engineering Services

How can we
help you?

Give us
a call

The brief

The 175,000 sqft commercial scheme BREEAM ‘Excellent’ building stands 12 storeys above the Manchester skyline; providing CAT A & B office accommodation, a roof terrace with panoramic views across the city centre, a secure basement car park with 19 spaces an extensive basement cycle storage and shower and locker facilities.

Briggs & Forrester were responsible for the installation of mechanical, electrical and public health services including LED lighting, 4 pipe fan coil air conditioning, LV distribution, generator, fire alarm, door access system, CCTV, lightning protection, photovoltaics, PA/VA system, intercom, disabled refuge, intruder alarm, dark fibre, car park traffic light system, above ground drainage, hot and cold water, sprinklers, underfloor heating, electric heating, BMS controls, car park ventilation, dry riser and rainwater.

Project summary...

Service value

£8.1m

Contract period

10 months

Consultant

Hoare Lea

Client

Marcus Worthington

Architect

Leach Rhodes Walker

What we did for this project...

We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.

The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.

We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.

How can we
help you?

Give us
a call

Related case studies

Commercial