The brief
Briggs & Forrester Engineering Services provided the installation of all mechanical, electrical and public health services for a new building at the City South Campus of Birmingham City University.
The project included an extension to the City South Phase 3 Campus, partial refurbishment of the existing Seacole Building and external landscaping works. This new building brings the School of Education and School of Health Sciences under one roof.
The City South Campus houses a number of faculties; the School of Education and the new School of Health Sciences, as well as new facilities for teacher training, nutrition sciences labs, therapy clinics and other general teaching spaces.
The services provided by Engineering Services included low pressure heating, displacement ventilation, BMS, CHP, comfort cooling, electrical distribution, small power, fire alarm, data, security, ISC smart building, photovoltaic, lighting and audio visual installation.
Project summary...
Service value
£10.5m
Contract period
46 weeks
Consultant
Briggs & Forrester Engineering Services
Client
BAM
Architect
Sheppard Robson
Added value
With a highly efficient building envelope an EPC A rating was achieved and a significant contribution made to the building achieving a BREEAM ‘Excellent’ rating. The effective design and installation of highly efficient building services systems including the provision of low and zero carbon technologies resulted in BCU City South achieving a 30% reduction in CO2 emissions against the Building Regulations Part L2A target.
The team’s positive approach within the work/build environment and ‘can do attitude’ and with their ability to communicate effectively is very refreshing. I have no doubt about the team’s abilities to succeed on all of your future projects.
What we did for this project...
We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.
The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.
We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.
Related case studies
Education
Booth Lane Campus
Northampton
Gradel Quadrangles
Oxford
Don Valley Academy
Doncaster
Fairfield Primary School
Milton Keynes
BCU 2A
Birmingham
BCU City South
Birmingham
Brecon High School
Brecon
Burntwood Academy
London
Health & Life Sciences Building
University of Reading
Harris Academy 6th Form
London
Institute of Translational Medicine
University of Birmingham
Oastler Building
Huddersfield
Sports Building
Southampton Solent University
Spring Lane Building
University of York
ATI National College
Doncaster
Rocester School
Staffordshire