Biocity
Nottingham
New five storey development consisting of laboratories & offices on ground floor to fourth floor along with a rooftop plant area.
The brief
New five storey development consisting of laboratories & offices on ground floor to fourth floor along with a rooftop plant area. The five storey, 50,000 sq ft building has expanded bioscience facilities in Nottingham city centre and accommodates up to 200 specialist science jobs. The state-of-the-art facility is fitted with biology and chemistry laboratories and ancillary space for commercial leasing to both start-up and existing small and medium sized enterprises (SMEs) in the bioscience sector.
Full design and build of the mechanical and electrical services, including power distribution, lighting, security and data systems, low temperature heating, chilled water air conditioning, domestic and public health services, ventilation, fume extract and building management system. Ventilation, fume extract, domestics, LTHW, chilled water, air-conditioning, VAV fume cupboard controls, BMS, lab gases, dry risers, HV/LV distribution, rising busbar, lighting. Small power, voice and data, fire alarm, security inc CCTV, access control and intruder alarm, disabled refuge and WC alarm, lightning protection.
Project summary...
Service value
£6.6m
Contract period
43 weeks
Consultant
Gleeds
Client
Willmott
Dixon
Architect
CPMG
Architects Ltd
Added Value
- Complex services and highly serviced voids to cater for the labs on each floor including Lab gases, ductwork, pipework and electrical services.
- Rooftop plant room with air handling plant, chiller and fume extract fans
- Central sterilisation unit
- BREEAM Very Good or higher BREEAM Excellent
- Bringing in the HV and district heating supplies Responsible for incoming HV supply.
I worked closely with the Briggs & Forrester team and was impressed by their pro-active approach and technical ability which clearly demonstrated their experience of undertaking similar projects in the laboratory and pharmaceutical sector. This together with the competence of their work force and supply chain was a significant factor in the successful delivery of this challenging project.
What we did for this project...
We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.
The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.
We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.
Related case studies
Pharmaceutical & Research
Biocity
Nottingham
Babraham Campus
Cambridge
Dyson D.I.E.T
Malmesbury
Dyson 9
Malmesbury
Health & Life Sciences Building
University of Reading
Institute of Translational Medicine
University of Birmingham
GKN Aerospace
Bristol
Thames Valley Science Park
Reading
Project Maia
Oxford
SERSF Building 2 & 3
University of Exeter
Space Satellite Manufacturing & Testing Facility
Rutherford Appleton Laboratories, Oxford
Johnson Matthey
Royston