The brief

The project consisted of a major redevelopment to the existing campus, which included of the demolition of three accommodation blocks to make way for the new Creative Centre.

The new Creative Centre spans 3 floors and houses 2,600m2 of flexible teaching areas, a 210-seat rectangular auditorium and a new 550m2 atrium, with a glass and timber roof to allow natural daylight to enter the building.  It contains specialist spaces for theatre, drama, creative writing and media production students.

Briggs & Forrester were responsible for the installation of mechanical, electrical and public health services including containment, CCTV, lightning protection, security, lighting, photovoltaics, fire alarm, access control, facilities for the disabled, air conditioning, dry risers, attenuators, boilers, sanitaryware, BMS, ventilation, external mains, fans, air handling units ductwork and thermal insulation.

Project summary...

Service value

£2.4m

Contract period

6 months

Consultant

Atelier Ten Ltd

Client

Kier Construction

Architect

Tate Harmer Architects

What we did for this project...

We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.

The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.

We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.

How can we
help you?

Give us
a call

Related case studies

Education