Exhibition Centre
Liverpool
A new exhibition centre offering 8,100m2 of flexible event space
The brief
Briggs & Forrester Engineering Services completed the MEP services contract for the prestigious Exhibition Centre located on the Kings Dock waterfront in Liverpool. The development is located on the site adjacent to the existing BT Convention Centre and Arena and is linked to the existing arena via a new elevated link bridge.
The exhibition centre offers 8,100m2 of event space across three exhibition halls including an atrium, meeting rooms, offices and corporate hospitality. The project is supported by a new 216 bedroom 4 star Pullman Hotel with accommodation across seven floors, hotel services to ground and first floor with MEP plant installed in a roof top plant room.
Briggs & Forrester completed the design, procurement, construction, testing and commissioning of the MEP services including LV/HV distribution systems, drainage, lighting control, BMS, domestic services, security & access control and the hall ventilation and conditioning system.
Project summary...
Service value
£12.25m
Contract period
20 months
Consultant
Briggs & Forrester Engineering Services
Client
ISG
Architect
Denton Corker Marshall
Added Value
Briggs & Forrester completed a design redevelopment to create a plant deck which would allow all plant to be in the same location rather than across two plantrooms. The creation of the plant deck also reduced the noise levels to the adjoining hotel and eliminated the need for expensive louvres.
We rationalised the original mechanical ventilation plant serving the main exhibition hall from the traditional chillers and boilers to an integral packaged air source heat pumps, which is far more energy efficient and reduced energy and running costs for the Client. Rationalisation of mechanical and air conditioning plant also resulted in reduced overall costs allowing the Clients budget to be met.
What we did for this project...
We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.
The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.
We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.
Related case studies
Sports & Leisure
Resorts World NEC
Birmingham
Finlake Holiday Village
Devon
Walkers Court and The Boulevard Theatre, Soho
Soho, London
Crewe Lifestyle Centre
Crewe
Exhibition Centre
Liverpool
Hippodrome Casino
London
Swiss Cottage Leisure Centre
London
Motor Heritage Centre
Warwickshire
Robins High Performance Centre
Bristol
National Cycling Centre
Manchester