Harris Academy 6th Form
London
Design and build of a new 4 storey 6th form educational facility
The brief
Briggs & Forrester Engineering Services were responsible for the design and build of the mechanical, electrical and public health services to the new Harris 6th Form located in Clapham, London. The building is 5,250m2 over 4 stories plus roof with plant rooms located on the ground floor, first floor and the roof. The main spaces include a main hall, kitchen, dining area, admin offices, ICT rich rooms, science labs, a fitness studio and the library.
MEP services include LV distribution, containment systems, small power, lighting, lighting control, photovoltaics, earthing, electrical testing, lightning protection, fire alarm, disabled refuges, toilet alarm, induction loops & structured cabling, LTHW to underfloor heating, radiators, MVHR’s and NVHR’s, AGD, rainwater, dry risers, MCWS, BCWS, HWS F&R, natural gas to boilers, GAHP, and science classrooms, AC to server rooms Gym and fitness suite only, general vent (to classroom areas, toilets, kitchen, main hall, drama studio and library), fume extract to 3no. fume cupboards, NVHR natural ventilation, smoke extract, BMS controls.
Project summary...
Service value
£2.8m
Contract period
8 Months
Consultant
Waterman
Client
Kier Construction
Architect
Nicholas Hare Architects
What we did for this project...
We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.
The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.
We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.
Related case studies
Education
Booth Lane Campus
Northampton
Gradel Quadrangles
Oxford
Don Valley Academy
Doncaster
Fairfield Primary School
Milton Keynes
BCU 2A
Birmingham
BCU City South
Birmingham
Brecon High School
Brecon
Burntwood Academy
London
Health & Life Sciences Building
University of Reading
Harris Academy 6th Form
London
Institute of Translational Medicine
University of Birmingham
Oastler Building
Huddersfield
Sports Building
Southampton Solent University
Spring Lane Building
University of York
ATI National College
Doncaster
Rocester School
Staffordshire