HCA Hospital
Birmingham
This joint venture project between HCA Healthcare UK and University Hospitals Birmingham NHS Foundation Trust (UHB) will treat patients over the age of 18 and will provide 122 new beds, a new radiotherapy unit and access to new state-of-the-art operating theatres.
The brief
The 8 storey 14,000 square metre hospital which includes both NHS & private beds and 5 theatres will be owned and run by HCA Healthcare UK who will deliver high quality services across a range of specialties on site. The hospital will be equipped with the latest technology to provide some of the most complex surgical and medical procedures in cancer, cardiology, neurology, hepatobiliary, urology, orthopaedics and stem cell transplantation.
Project summary...
Service value
£26m
Contract period
84 weeks
Consultant
Couch
Perry Wilkes
Client
5 Boroughs
NHS Trust
Architect
Hok
International
Added Value
The scope of works to the new specialist hospital facility including the design, build and commissioning of traditional M&E services together with specialists services associated with a health scheme of this nature including full standby generation, medical gases, nurse call, theatre equipment, IPS/UPS systems etc.
diversion, replacement and removal of existing services which traverse the site and the connection of utilities is also included. The services incorporate a high level of resilience required to support the ongoing operation of the facility such as N+1 on plant and equipment.
Briggs & Forrester were receptive and flexible to the requirements required. They were always polite and helpful when required.
What we did for this project...
We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.
The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.
We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.
Related case studies
Healthcare
Spire Healthcare
Nottingham
HCA Hospital
Birmingham
Whitehouse Medical Centre
Milton Keynes
Atherleigh Park Hospital
Leigh
RJ & AH Hospital
Oswestry
Kettering General Hospital
Kettering
Norwich & Norfolk Hospital
Norwich
Peterborough ICC & MHU
Peterborough
Worcestershire Royal Hospital
Worcestershire