The brief
The University of Reading’s new high quality Health & Life Sciences facility within this existing campus will provide 7,600m2 of lab, write up and museum areas over five floors. The BREEAM ‘Very Good’ building of which the third floor is a BRU area with class 3 labs, procedure rooms and holding rooms.
Briggs & Forrester were responsible for the mechanical and electrical service installations including domestic water, ventilation, heating & cooling, BMS, lab gases, fume cupboard ventilation, compressed air, steam, cold rooms, LV distribution, internal and external lighting, ICT, disabled refuge, fire alarm, access control, CCTV and lightning protection with photovoltaic as a low and zero carbon technology.
Project summary...
Service value
£10.9m
Contract period
14 Months
Consultant
AECOM
Client
Balfour Beatty
Architect
Stride Treglown
Added Value
This was a particularly challenging project due to the demanding criteria that had to be met for Home Office Licensing and the need to complete for the new University term despite the challenges set as a result of Covid-19. However, the team worked incredibly well to overcome the challenges faced and delivered the project to a high standard. The University began their internal population of the teaching areas and Cole Museum immediately after handover.
Site safety was very good, with Briggs & Forrester overseeing a large number of supply chain packages. Method statements were of high quality and issued in a prompt and efficient manner.
What we did for this project...
We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.
The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.
We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.
Related case studies
Education
Booth Lane Campus
Northampton
Gradel Quadrangles
Oxford
Don Valley Academy
Doncaster
Fairfield Primary School
Milton Keynes
BCU 2A
Birmingham
BCU City South
Birmingham
Brecon High School
Brecon
Burntwood Academy
London
Health & Life Sciences Building
University of Reading
Harris Academy 6th Form
London
Institute of Translational Medicine
University of Birmingham
Oastler Building
Huddersfield
Sports Building
Southampton Solent University
Spring Lane Building
University of York
ATI National College
Doncaster
Rocester School
Staffordshire