The brief

Briggs & Forrester completed this project which created a new space at the British Motor Museum in Warwickshire. Housing one of the largest collections of historic British cars in the world, the museum tells the story of the motor car and its growing influence on society over the decades.

Briggs & Forrester designed, installed and commissioned the various mechanical, electrical systems at the centre. Works included the construction of a new two-storey steel-framed building with circa 4,850m2 gross internal floor area, a 700m2 workshop and associated machine shops, valet bays and six vehicle ramps. Further works included external drainage for existing service diversions and new services connections.

Together with general building services installation, specialist requirements included compressed air, a vehicle exhause system and access control.

Project summary...

Service value

£850k

Contract period

16 weeks

Consultant

Clancy

Client

Galliford Try

Architect

Weedon

What we did for this project...

We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.

The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.

We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.