Newfoundland
London
Shell and core and fit out of 63 storey residential tower located in London city centre
The brief
Briggs & Forrester completed the MEP works to residential tower Newfoundland, located in Canary Wharf providing shell & core and fit-out services to 636 apartments and core areas.
The 63-storey residential skyscraper features studio, one, two and three-bedroom apartments ranging from 429 sq. ft. to 1,819 sq. The building offers a terrace garden, play area, gym and a level-two lounge.
Services delivered included the supply and installation of sanitaryware, power & lighting, residential sprinklers, CHW & LTHW, hot and cold water, fire alarms, smoke control, data, ventilation, apartment control systems and testing & commissioning.
Project summary...
Service value
£54m
Contract period
28 months
Consultant
Hoare Lea
Client
Canary Wharf Contractors
Architect
Horden Cherry Lee
Added value
Briggs & Forrester implemented off-site pre-fabrication to relieve labour and ensure a high level of quality in production and provided full 3D BIM modelling on the project.
The project was delivered using the ‘Just in time’ technique which means that the team of 200 site workers had to get all materials up to the work faces on a daily basis. The Newfoundland development topped out towards the end of 2018, reaching its full height of 220 metres. Over 14,000m² of pre-cast concrete plank and 9,500 tonnes of structural steelwork have been erected for Newfoundland to reach its full height.
What we did for this project...
We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.
The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.
We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.
Related case studies
Residential & Housing
One Blackfriars
London
250 City Road
London
Angel Gardens
Manchester
The Forge
Newcastle
Middlewood Locks
Manchester
Battersea Reach
London
Chelsea Creek F
London
Cashmere Wharf
London
Fulham Reach F2
London
Principal Place
London
Sovereign Court Phase 2
London
Newfoundland
London
The Lexington
Liverpool
Kampus
Manchester
E05 The Robinson
London
Plot 7 Perry Bar
Birmingham