Norwich & Norfolk Hospital

Norwich

MEP services to two new 150 bed ward blocks, theatres, cardiac and renal unit and medical school facility

Engineering Services

Norwich & Norfolk Hospital

Engineering Services

How can we
help you?

Give us
a call

The brief

Briggs & Forrester provided the installation of the mechanical, electrical and public health services to two new 150 bed ward blocks and an associated link building, an obstetrics theatre, general theatre, cardiac unit, renal unit, medical school facility and Linear Accelerator Machine facility.

Services included medical gases, specialist surgeons pendants, bedhead trunking, specialist renal water system, domestic water, fire alarms, lighting, building management system, heating, ventilation and air conditioning, security and a pneumatic conveyor system.

Project summary...

Service value

£9.2m

Contract period

20 months

Consultant

Hoare Lea

Client

John Laing Construction

Architect

Anshen Dyer Associates

What we did for this project...

We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.

The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.

We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.

How can we
help you?

Give us
a call

Related case studies

Healthcare