The brief

Briggs & Forrester Engineering Services have delivered the MEP contract on the new secondary Shirelands CBSO Academy in West Bromwich working in collaboration with the Main Contractor Galliford Try Construction.

A five storey office building was refurbished to create a free, non-selective state school for up to 870 students. The building features a double height entrance lobby, tripe height 300 seat performance hall built within an existing atrium and linked to the drama studio, a double height library, teaching areas and audio visual experience rooms which can be used as immersive spaces for SEN pupils.

In addition there is a new sports building on an adjacent road which includes an activity studio, large sports hall with three badminton courts, changing rooms and shower facilities.

The academy has been developed as part of a partnership between Shireland Collegiate Academy Trust and the City of Birmingham Symphony Orchestra. Engineering Services were responsible for delivering the full mechanical, electrical and public health services package.

Project summary...

Service value

£4.4m

Contract period

54 Weeks

Consultant

Briggs & Forrester Engineering Services Ltd

Client

Galliford Try Construction

Architect

ADP

What we did for this project...

We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.

The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.

We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.