The brief

Briggs & Forrester Engineering Services successfully completed a phased refurbishment, Design & Build Stage 3+, to an existing office building in central Bristol. The project included Cat A refurbishment over 5 floors with the client in occupation, on 2 floors, thoughout the project.

Briggs & Forrester Engineering Services took a multi-disciplinary approach working collaboratively with Midas Construction to achieve this successful project despite the logistical challenges of the project in a prominent position, near Temple Meads train station, in Bristol City Centre.

Services installed included the lighting, small power, containment, fire alarm, security, intruder, CCTV, access, conduit installation, 6491B singles, new SWA supplies to new distribution boards on each floor, ductwork, VRF, FCU’s, grilles, thermal insulation, HTG pipework, BMS, UFH, water treatment. Engineering Services in-house Commissioning Managers were also responsible for the testing and commissioning.

The project achieved BREEAM Very Good.

Project summary...

Service value

£2.1m

Contract period

10 months

Consultant

Hoare Lea

Client

Midas Construction

Architect

Stride Treglown

Added value

The project was located on Redcliffe Way near Bristol Temple Meads in a large city centre. Engineering Services used a ‘just in time’ delivery system in order to work proactively coordinating deliveries.

To ensure the standard of installation remained high Engineering Services also ensured planning and programming was as accurate as possible. This, in turn, enabled high standards of health & safety in a busy city centre environment.

What we did for this project...

We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.

The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.

We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.

How can we
help you?

Give us
a call

Related case studies

Commercial