Whitehouse
Health Centre
Milton Keynes
A new health centre offering 22 primary care rooms with a minor surgery
The brief
All in one 20,400 sq ft facility including consulting rooms, a minor surgery, recovery rooms, nurse led treatment rooms, a pharmacy, ancillary clinical support rooms and health education rooms.
Mechanical works carried out included two air handling units providing ventilation to the various rooms and spaces, LTHW heating system comprising of two boilers, radiators and radiant panels. Domestic hot and cold water was provided by a storage tank, booster pump and plate heat exchanger. Electrical services included power, lighting, fire alarm, data, security, CCTV and solar PV panels.
Project summary...
Service value
£2.1m
Contract period
18 months
Consultant
Gleeds
Client
Willmott Dixon
Architect
Race Cottam Associates
Added value
A change in the client’s operational space requirements during the latter stages of the preconstruction process involved a redesign of the architectural layouts and MEP services.
The client was keen to maintain programme so Briggs & Forrester worked closely with the Willmott Dixon design team to incorporate the changes and expedited procurement to ensure that the objective of a timely start on site was achieved.
What we did for this project...
We have a fully integrated design and build capability across the group, including 3D coordination and Building Information Modelling. By developing the design and being fully involved in the early stages of a project, we can provide timely design solutions and verification.
The group provides a range of specialist skills encompassing engineering, design, installation, and maintenance. The combined experience, knowledge and expertise of all five divisions enables the group to develop and implement fully-integrated solutions for some of the most complex and demanding mechanical, electrical and public health engineering installations.
We guarantee a smooth handover transition with the project team remaining the main point of contact, the development of commissioning and training plan and regular visits from our team in the months after practical completion.
Related case studies
Healthcare
Spire Healthcare
Nottingham
HCA Hospital
Birmingham
Whitehouse Medical Centre
Milton Keynes
Atherleigh Park Hospital
Leigh
RJ & AH Hospital
Oswestry
Kettering General Hospital
Kettering
Norwich & Norfolk Hospital
Norwich
Peterborough ICC & MHU
Peterborough
Worcestershire Royal Hospital
Worcestershire