04 Nov 2025
The Forum MEP install completed by Briggs & Forrester Engineering Services
Working in collaboration with Kier, Briggs & Forrester Engineering Services have successfully completed the circa £17m mechanical, electrical, and public health package on The Forum, Gloucester.
Located adjacent to Kings Square and Gloucester Train Station, The Forum will provide high standard office space, a 4-star hotel, a rooftop restaurant & bar overlooking Gloucester Cathedral and on site car parking spaces with 42 EV charging points.
The Forum is designed with sustainability in mind, targeting a BREEAM “Excellent” rating, Net Zero carbon operation enabled and WiredScore Platinum. To support the high sustainability requirements, The Forum has solar panels on the roof to provide sustainable energy to the building and is home to the largest constructed green wall in the South West.
Throughout the project, our operational team at The Forum contributed towards various social value initiatives furthering our positive impact on the local community; a highlight for the team was assisting Kier in developing an excellent learning centre to be utilised by the local community providing workshops and training sessions.